资讯

Bangalore Metro Rail Corporation Ltd (BMRCL) plans to outsource staff for the Yellow and Pink Lines to meet deadlines, ...
The Bengaluru Metropolitan Transport Corporation’s (BMTC) new non-AC limited-stop express services have struck a chord with ...
The 19.15 km line will enhance connectivity, passing key points. Currently, three trains will operate at 25-minute intervals, ...
The 19-km fully elevated Yellow Line, connecting RV Road to Bommasandra with 16 stations, was originally scheduled for ...
BENGALURU: Yellow Line operations will hopefully commence by August 15, with the frequency, number of stations to be ...
Bengaluru's Namma Metro Yellow Line, an 18.8 km elevated stretch connecting RV Road to Bommasandra, is nearing completion ...
Bengaluru South MP Tejasvi Surya has initiated a public countdown for the delayed Namma Metro Yellow Line, urging accountability from BMRCL.
Bengaluru: The long-delayed opening of Namma Metro's Yellow Line has taken a political twist, with the ruling Congress and ...